CCIE SP Operations笔试考试大纲2

企业动态
The Cisco SP Operations Written Exam (#350-060) has 90-110 questions and is two hours in duration. The topic areas listed are general guidelines for the type of content that is likely to appear on the exam. Please note, however, that other relevant or related topic areas may also appear.

The Cisco SP Operations Written Exam (#350-060) has 90-110 questions and is two hours in duration. The topic areas listed are general guidelines for the type of content that is likely to appear on the exam. Please note, however, that other relevant or related topic areas may also appear.

 
Exam Sections and Sub-task Objectives

1.0
Manage the network fault management system
 
1.1
Develop a fault management process for a managed network environment collaboratively with the tools team
1.2
Determine the interaction between the fault management system and the ticketing system in collaboration with the tools team
1.3
Determine the method to gather appropriate metrics for an established fault management process
2.0
Manage performance and capacity
 
2.1
Identify spikes and potential trouble spots based on syslog and/or Network Management System (NMS) output
2.2
Develop a plan to solve a particular performance issue based on syslog and/or Network Management System (NMS) output
2.3
Identify the Network Management System (NMS) metrics and SLA metrics that will be needed in order to further troubleshoot a specific problem communicated orally, written, etc.
2.4
Develop a plan to establish a baseline and monitor the network in conjunction with the tools and performance groups
2.5
Create baseline network performance in conjunction with engineering and architecture teams
2.6
Monitor the network to look for variances against the baseline
2.7
Edit existing scripts which enable a network baseline management plan in conjunction with the tools and performance groups
3.0
Manage operations processes
 
3.1
Collaborate with the process team and NOC management on process development to meet a desired network operational objective
3.2
Develop a specific prototype and test plan for a particular planned network change, working collaboratively with the engineering and design groups
3.3
Develop, for a particular network, a list of needed tools working collaboratively with the tools team
3.4
Develop a detailed operations plan  including metrics and reporting functions for a particular network working collaboratively with the process team
3.5
Develop a process change action plan based on the results of a network audit
3.6
Develop and maintain a spares plan for a particular network
4.0
Troubleshoot and fix reachability and transport problems within the network
 
4.1
Identify predecessor steps that have not been executed based on an escalation ticket dealing with reachability
4.2
Determine whether to fix or escalate a ticket dealing with reachability
4.3
Identify the area(s) causing a complex reachability problem of unknown origin
4.4
Troubleshoot a complex routing problem and, considering the technical aspects, determine the risks and fix it
4.5
Troubleshoot a complex security problem and, considering the technical aspects, determine the risks and fix it
5.0
Identify problems in implementation plans
 
5.1
Find issues of a rollout plan received from engineering before deployment
5.2
Identify hardware which is not backwards compatible on a new service rollout plan
5.3
Find hardware that needs operating system upgrades on a new service rollout plan
5.4
Review and provide recommendations on areas in which NOC support plans will not be sufficient on a new service rollout plan
6.0
Troubleshoot and fix network performance problems
 
6.1
Identify predecessor steps that have not been executed based on an escalation ticket dealing with network performance
6.2
Determine whether to fix or escalate a ticket dealing with network performance
6.3
Determine whether to fix or where to escalate a core network fault
6.4
Identify the source of a complex network performance problem
6.5
Troubleshoot a complex network performance problem and, considering the technical aspects, determine the risks and fix it
6.6
Identify a complex application performance problem and isolate it
6.7
Identify a complex computing device (server, call manager, etc - not the network or application) performance problem and isolate it
6.8
Troubleshoot a complex traffic pattern problem and, considering the technical aspects, determine the risks and fix it
6.9
Troubleshoot a complex, chronic performance problem and, considering the technical aspects, determine the risks and fix it

 

【编辑推荐】

  1. New CCIE R/S 4.0(面试题)Core Knowledge Questions
  2. 思科新推CCIE SPo认证(CCIE SPo,CCNP SPo,CCNA SPo)
  3. New CCIE R/S 4.0(面试题)Core Knowledge Questions
责任编辑:张攀 来源: 56cto
相关推荐

2010-05-10 10:27:57

CCIE SP Ope

2010-11-15 11:14:17

CCIE

2009-10-20 14:01:00

CCIE考试

2009-10-22 09:46:14

CCIE SP

2010-11-15 11:10:35

CCIE

2009-09-08 08:57:29

思科认证CCIE考试规CCIE

2009-09-27 14:50:42

CCIE笔试实验考试

2009-02-15 18:31:42

CCIE路由交换实验香港考试

2009-08-19 09:42:59

思科认证CCIE考试大纲

2010-03-30 10:17:32

CCIE RS4.0

2009-05-12 18:23:29

CCIE考试大纲路由交换

2009-09-14 09:11:13

CCIE考试体系介绍CCIE

2009-09-22 15:54:42

CCIE笔试

2009-09-11 10:50:36

CCIE认证笔试经验

2009-09-28 13:16:00

CCNA考试考点CCNA

2009-10-09 14:47:00

CCNA考试考点CCNA

2009-01-18 11:21:16

路由交换CCIE实验考试

2009-09-03 09:39:42

思科CCIE认证考试心得

2009-10-13 14:51:00

CCIE考试

2009-09-01 13:28:17

思科CCIE认证考试攻略
点赞
收藏

51CTO技术栈公众号